Field Study of Tier 2 Advanced Power Strips
Christopher Plum — Feb 2018
Why This Research Is Needed
This project’s goal is to establish the energy savings of new Tier 2 advanced power strips to encourage adoption in commercial buildings. Plug load energy use is the fastest growing end use for commercial buildings in the U.S., growing by about 3% annually. The increase in plug load energy use stands in contrast to decreases in other end uses, such as cooling and lighting. Our team recently completed a CARD-funded research project; Commercial Building Plug Load Energy Reduction Strategies, that demonstrated 20% to 30% savings in office plug loads. A new product has entered the market with claims of even larger savings. This project will supplement the original study by adding these Tier 2 power strips. We will conduct a targeted field study to measure the potential of this new strategy, and to supplement the previous study, we will use the same methods of measuring workstation and device-level electrical use, in addition to characterizing the sites so the results can be extrapolated to a wide variety of office types.
Project Process and Expected Outcomes
This short duration study will examine a targeted set of issues and strategies focused on office workstation loads, including PCs, monitors, task lighting, and personal printers. We will perform detailed monitoring in three office areas over the course of six months, use a pre-test/post-test experimental design to determine energy savings from the technology (document installation practices), and survey both users and IT management about their experiences with the technology. As in the previous study, field measurements will be used to collect baseline data and plug load control strategies will be implemented with the energy savings measured (key considerations will be cost-effectiveness and accuracy). In addition to the full final report and webinar, we will mine the data analysis for key program and policy conclusions to create a factsheet for CIP personnel, IT staff, and building owners. This brief will also include key results and conclusions from the occupant and IT staff survey, and will help occupants and IT staff understand how to effectively use APS technology and overcome barriers and commonly encountered problems.
This project is supported by a grant from the Minnesota Department of Commerce, Division of Energy Resources through the Conservation Applied Research and Development (CARD) program, which is funded by Minnesota ratepayers. CEE is a subcontractor to Seventhwave on this project.